Category: 21st Century Library

shhhh

Now Open for Quiet Study: 235A, Main Floor

Room 235A, in the Infusion/Java City area on the main floor, will be open for quiet study to alleviate crowding in the remaining 4th floor quiet study area on the “Reflecting Pond” side of the John C. Hitt Library. The “back half” of the 4th floor is closed for the installation of sprinklers for fire safety.

We are sorry for the inconvenience, noise, and dust.

closures banner

Noise and Closure Alerts, beginning 3/20

3rd Floor

Restrooms on the 3rd floor in the “back half” of the building will remain closed for renovation.

4th Floor

Starting Monday night, 3/20, the “Student Union side” of the 4th floor of the John C. Hitt Library will be closed for the installation of sprinklers. Materials in call numbers N through QP will be inaccessible, but can be requested online, please see a staff member for assistance. Items will be retrieved several times daily, and can be picked up at the Circulation Desk. It is estimated that this work will be completed around 5/1/17. Over the next months the entire building will be fitted with fire sprinklers as part of the ongoing work on the 21st Century Library project.

5th Floor

Work continues on the study area of the 5th floor. When completed, the area will offer students a bright, new, space for silent, individual study, research, reflection, and coursework.

 

More information about the 21st Century Library project is at: http://library.ucf.edu/21st/ You can check there for any work alerts. Earplugs remain available at the Circulation Desk.

Attention Banner

Noise and Closure Alerts

Spring Break closures include:

** The back half of the second (main) floor of the John C. Hitt Library will be closed, starting Friday evening, March 10, and reopening on Monday, March 20. Turner construction will be installing fire sprinklers in the area. You can request items from the Reference collection, located in the work area, to be retrieved for you. There is an online form linked to http://library.ucf.edu/news/reference-book-request-2017/
Over the next months the entire building will be fitted with fire sprinklers as part of the ongoing work on the 21st Century Library project.

**Restrooms on the 3rd floor in the “back half” of the building will remain closed for renovation. The 4th floor restrooms in the “back” of the building have re-opened.

More information about the 21st Century Library project is at: http://library.ucf.edu/21st/ You can check there for any work alerts. Earplugs remain available at the Circulation Desk.

Attention Banner

Noise and Closure Alert: 3rd Floor Restrooms; 4th Floor Restrooms OPEN

At this time, 3rd floor restrooms on the “Student Union side” of the John C. Hitt Library are closed. We apologize for this inconvenience and for the noise. All other restrooms in the building remain open.
Work on the 4th floor restrooms has been completed and they are open.
Completed restrooms will have new fixtures, walls and floors, and will be more easily accessible to those with disabilities.
If you are disturbed by noise, please ask for earplugs at the Circulation Desk on the 2nd (main) floor.

5th-floor-study-closure-banner

5th Floor Study Space Closed

5th floor study space will be closed during spring semester for the construction of a new quiet study space. 5th floor library offices and Special Collections and University Archives will remain open, accessible by the south staircase and the bank of three elevators. 4th floor will remain in use as a quiet study floor.

The 4th floor bathroom on the Student Union side of the building is getting closer to completion, but remains closed as construction continues. The noise, dust, and inconvenience will make way for exciting, new spaces for student research, group work, and study.

Earplugs are available at the Circulation Services Desk on the main (2nd) floor.

More information about the 21st Century Library project is available at http://library.ucf.edu/21st/.

Back to Top