Category: 21st Century Library

Attention Banner

Noise Alert: 4th floor

Work is scheduled to begin on the 4th floor restrooms on the Student Union side of the John C. Hitt Library building on October 17. Work will include demolition and construction.
Earplugs can be requested at the Circulation Desk, main floor.
Site preparation for the Automated Retrieval Center continues on the north side of the building.
More information on the 21st Century Library project: http://library.ucf.edu/21st/

road closure

Road Closure

The service road from the library loading dock up to the turn at the Student Union will be closed to pedestrians and vehicles during the following times:

Sept 12th: 10:00 PM to 7:00 AM the following morning
Sept 13th: 10:00 PM to 7:00 AM the following morning
Sept 14th: 10:00 PM to 7:00 AM the following morning

The road is being temporarily closed as part of work being done for the 21st Century Library Project.

21st Century Library Concept banner

Information on the 21st Century Library project

Site preparation is underway for construction on the Student Union side of the John C. Hitt Library. A webpage, 21st Century Library, is now available with more information. News, information about the Automated Retrieval Center, a site plan, and some Frequently Asked Questions are included.
Visit http://library.ucf.edu/21st/ now and then to stay informed on UCF’s 21st Century Library project.

21st Century Library Concept banner

Noise alert! North (Student Union) side of the John C. Hitt Library

You may have noticed heavy equipment and some digging behind the John C. Hitt Library. There will be noise in the library associated with the site preparation work, particularly on that side of the building.

The site is being prepared for some of the work on Phase 1 of the 21st Century Library project, which will include construction of an Automated Retrieval Center (ARC) on the north side of the current library building.

Pardon our dust! The transformation of the library is just beginning.

21st Century Library Concept banner

What’s behind the fence?

Have you noticed the fencing installed on the north (Student Union) side of the John C. Hitt Library building?

This is the start of Phase 1 of the 21st Century Library project. The site is being prepared for construction of the Automated Retrieval Center (ARC), a four-story structure designed to accommodate 1.25 million print volumes for quick retrieval in a three-story high space. In Phase 2 of the project, a student work space surrounded by windows will be created on the fourth floor, at the top of the ARC.

Before work begins on the ARC, power and plumbing lines will be installed. A new parking area will be completed in a fenced area in front of the College of Sciences, and the current parking spaces will be removed to make way for the ARC.

Back to Top