News & Blog

Posts Tagged: closure

BLueprint of fourth floor after renovations with text in yellow reads Hitt Library REnovation Updates

Exciting Times Ahead: Library Fourth Floor Renovation

We are delighted to share some thrilling news with you all! After much anticipation and planning, we are gearing up for a significant transformation within our library. That is right – the Fourth Floor is about to undergo a comprehensive renovation!

Closing for Renovation: June 1st, 2024

Beginning June 1st, 2024, the Fourth Floor will temporarily close its doors to make way for an exciting two-year renovation project. While we understand that this may bring some initial disappointment to those who frequent this space, we assure you that the end result will be well worth the wait.

What Can You Expect?

Picture this: a revitalized Fourth Floor boasting a brand new Tech Studio with podcasting and video shooting studios, more study rooms, new silent study area, and conference rooms designed to elevate your library experience to new heights. From cutting-edge technology upgrades to expanded study spaces, innovative learning zones, and breathtaking design elements – the possibilities are endless!

Temporary Changes

During the renovation period, access to the Fourth Floor will be restricted. However, fear not! The fifth floor silent study will remain fully operational and accessible to all patrons during construction.

Stay Connected

We are committed to keeping you informed every step of the way. Be sure to follow us on social media or check our website regularly for updates, sneak peeks, and progress reports on the renovation process. Your support and patience are greatly appreciated as we work diligently to bring our vision for the Fourth Floor to life.

A Future of Possibilities

As we embark on this journey of transformation, we invite you to join us in envisioning the incredible possibilities that lie ahead. Together, we will create a space where knowledge thrives, curiosity is sparked, and lifelong learning flourishes.

Thank you for your continued support and enthusiasm. We can not wait to unveil the exciting new chapter in the story of our library!

21st century library exterior large bg image

1st Floor Closure During Spring Break

During Spring Break, Monday March 11 to Sunday, March 17, the 1st floor (lowest level) of the John C. Hitt Library will be closed for work related to construction of the 21st Century Library project.  2nd (main), 3rd, 4th and 5th floors will remain open.  To retrieve a book from the 1st floor, click on the “Request” link in the catalog record for the item, and fill out the brief form with your NID and email.  You will receive an email when the book is ready for you at the Circulation Desk.

Please note Spring Break hours: the library will be closed on Sunday, March 10, and Saturday, March 16.  Monday through Thursday, the library will be open from 7.30 a.m. to 8.00 p.m.  Friday, March 15, the library will be open from 7.30 a.m. to 7.00 p.m.

Come in and enjoy the peaceful atmosphere and get some work done—or take your books to the beach!

Construction Duck

U. S. Documents affected by 1st floor closure

Because of the preliminary construction on the 1st floor, about 40% of print U.S. Documents are temporarily stored offsite and are completely inaccessible. The remaining materials are accessible for staff to retrieve for patrons, but the 1st floor is closed to the public through the end of September.

Our UCF Ask A Librarian service will attempt to verify the availability of specific items. They will pass along requests to Government Documents librarian, Rich Gause, for anything they cannot locate.

See the guide at https://guides.ucf.edu/govx for more information.
Thank you for your patience!

Attention Banner

1st Floor Closure Begins May 29

Pardon our DuckBeginning Tuesday, May 29, the 1st floor of the John C. Hitt Library will be closed to prepare for and start construction.

Please pardon the noise, dust, and inconvenience.

Need a book on shelves A – F? Find it in the library catalog, and click on the “Request” link. You will be notified when you can pick up your book at the Circulation Desk on the main (2nd) floor.

Assistance with Government Documents and the documents collection can be requested at the Research and Information Desk on 2nd (main) floor.
Earplugs remain available at the Circulation Desk.

closures banner

John C. Hitt Library Closure, 12/16/17 through 1/1/18

Due to a planned power outage during this time, the John C. Hitt Library will be closed from Saturday, 12/16/17 through Monday, 1/1/18. Library resources will be available at library.ucf.edu.

Please return books by Friday, December 15, and check out books you need by Friday, December 15.

Interlibrary Loan/Document Delivery

Book requests received after Wednesday, December 6 will be sent forward in January 2018. Article requests will continue to be processed until Wednesday, December 13. Document Delivery requests will be processed until Thursday, December 14.

LibTech

LibTech will perform regularly scheduled maintenance on all items during Winter Break.
iPads will no longer be circulated after 5:00pm on Thursday December 7th.
All other LibTech items (except items with 4 hour loan periods) will no longer be circulated after 5:00pm on Saturday December 9th.

The John C. Hitt Library will open on Tuesday, January 2, 2018.

Back to Top