News & Blog

Posts Tagged: noise

Closures banner 08-01

Update: Noise and Closures

The Student Union side of the 3rd floor is now open! This means that the front side of the 3rd floor is now closed for work on the sprinklers. These items are inaccessible: Books with call numbers HT1507- M, Oversize books J-Z, Media and Current Periodicals. Search for the item you would like in the UCF catalog and click on Place a Hold in the bottom right corner of the record. Your item will be retrieved and you will be notified to pick it up at the Circulation Desk.

A path remains open to the LibTech Desk
from the “Bank of 2 elevators” and North and East stairs.
Only one elevator remains open in the “Bank of 3” elevators on the south side of the building as work continues on the other 2 elevators.

The west stairwell is currently closed. All others are open.

Work continues on the 1st and 2nd floor restrooms. Restrooms on 2M, the restrooms on the Student Union side of 3rd floor, 4th floor, and 5th floor remain open.

The 5th floor study area remains closed for preparation of the Quiet Study Zone. Special Collections and Archives and all 5th floor offices remain open and accessible by south stairs or the operating elevator in the bank of 3 elevators.

Construction on the Automated Retrieval Center between the library and the Student Union is moving forward.

If you find the noise challenging, do not hesitate to ask for earplugs at the Circulation Desk.

Thank you for your patience as the 21st Century Library project moves forward!

closures map banner

Noise and Closure Alerts, beginning 5/17

1st & 2nd Floors

Restrooms on the 1st and 2nd Floors in the “back half” of the building are closed for renovation. Newly renovated restrooms are open on the 3rd and 4th Floors.

4th Floor

The “front half” of library is closed on the 4th Floor for the installation of sprinklers. Need a book on shelves QR-Z? Find it in our catalog and click on the “Place a Hold” link. You will be notified by email when you can pick up your book at the Circulation Desk.

5th Floor

Quiet Study space remains closed for Construction.

North Stairwell

Closed on all floors, use only in case of emergency.

More information about the 21st Century Library project is at: http://library.ucf.edu/21st/ You can check there for any work alerts. Earplugs remain available at the Circulation Desk.

closures banner

Noise and Closure Alerts, beginning 5/3

2nd Floor

Java City area closed.  Knowledge Commons remains open.  Use bank of three elevators to access InterLibrary Loan, Mezzanine Restrooms, and 5th floor (Acquisitions, Administration, Cataloging, Special Collections).  Request Knight Reads via the online catalog or at Circulation Services.  South stairwell closed on 2nd floor unless in case of emergency.  Use elevators or Front, East, or West stairwells.

3rd Floor

Restrooms on the 3rd floor in the “back half” of the building remain closed for renovation.

4th Floor

The 4th has re-opened, all seating and restrooms are open.

5th Floor

Quiet Study space remains closed for Construction.

North Stairwell

Closed on all floors, use only in case of emergency.

 

More information about the 21st Century Library project is at: http://library.ucf.edu/21st/ You can check there for any work alerts. Earplugs remain available at the Circulation Desk.

closures banner

Noise and Closure Alerts, beginning 3/20

3rd Floor

Restrooms on the 3rd floor in the “back half” of the building will remain closed for renovation.

4th Floor

Starting Monday night, 3/20, the “Student Union side” of the 4th floor of the John C. Hitt Library will be closed for the installation of sprinklers. Materials in call numbers N through QP will be inaccessible, but can be requested online, please see a staff member for assistance. Items will be retrieved several times daily, and can be picked up at the Circulation Desk. It is estimated that this work will be completed around 5/1/17. Over the next months the entire building will be fitted with fire sprinklers as part of the ongoing work on the 21st Century Library project.

5th Floor

Work continues on the study area of the 5th floor. When completed, the area will offer students a bright, new, space for silent, individual study, research, reflection, and coursework.

 

More information about the 21st Century Library project is at: http://library.ucf.edu/21st/ You can check there for any work alerts. Earplugs remain available at the Circulation Desk.

Attention Banner

Noise and Closure Alerts

Spring Break closures include:

** The back half of the second (main) floor of the John C. Hitt Library will be closed, starting Friday evening, March 10, and reopening on Monday, March 20. Turner construction will be installing fire sprinklers in the area. You can request items from the Reference collection, located in the work area, to be retrieved for you. There is an online form linked to http://library.ucf.edu/news/reference-book-request-2017/
Over the next months the entire building will be fitted with fire sprinklers as part of the ongoing work on the 21st Century Library project.

**Restrooms on the 3rd floor in the “back half” of the building will remain closed for renovation. The 4th floor restrooms in the “back” of the building have re-opened.

More information about the 21st Century Library project is at: http://library.ucf.edu/21st/ You can check there for any work alerts. Earplugs remain available at the Circulation Desk.

Back to Top